Case Study – Multiple Uses, One Project

Examines use of 490 tons of high strength WWR for paving, slabs-on-grade, supported corridor slabs, precast units, and beam shear cages. Value engineering played a big role in saving money and helped construction stay ahead of schedule. Cost savings of $125,000 were realized by reduced forming turnover time and placing time. By using high strength WWR over conventional strength reinforcing, 15% of the material costs were saved.